Dissection – It’s a dirty job…

DSC_0482

OK – everything is either blasted, stripped, scuffed, ground, or sanded, and we’re ready to put some red oxide into the enclosed areas. There was not much left of the LH B-Post – there will be lots of reconstruction in here just to get back to the point where we can start the floor and sill replacement.

Bookmark the permalink.